Illustrative mockup — placeholder data for design demonstration. Not actual study findings.
RWB Impact Studypolicy command center
EvidenceHighModerateIndicativeInsufficient
Executive brief
Compare(0/4)
Pin states or waterbodies from any module — side-by-side comparison follows you.
Module 04 · Waterbody Structure Profile

Jharkhand site 6

WB-1005Phase 2 · early learningModerate

Panel 1 · Structure & site facts

Site register (illustrative)

High
Structure
Percolation tank
Phase
P2
Arm
Intervention
State
Jharkhand
District
Jharkhand District 1
Agro-ecozone
Hard-rock
Works period
FY 2021–22
NGO partner
Foundation for Ecological Security
Per-waterbody cost
₹ 19 lakh
Storage created (approx.)
17,100 m³
Coordinates
25.191, 82.305
Matched comparison
WB-1006
Structure type populates from the final waterbody database (pending) — filled here from placeholder classifications.
Illustrative — not actual RWB findings

Panel 2 · Geohydrological classification

Litho-hydrological review + PRA

Moderate
Zone
Recharge
Permeability
Low
Landform
Valley floor

A waterbody in a discharge zone on impermeable strata cannot support a groundwater-recharge claim regardless of surface observations. This classification gates Panel 3 and the SROI recharge stream.

Illustrative — not actual RWB findings

Panel 3 · Current status & early signal

PRA + site observation

Indicative
Early learning — not a long-term outcome claim

At the time of assessment, Jharkhand site 6 is functionally operational with visible water retention through the post-monsoon window. Community reports a modest uplift in cattle-water access; TMC is not yet formed and active. A DiD-style outcome readout is not rendered for Phase 2 sites because no comparable baseline exists.

Illustrative — not actual RWB findings

Site observation status

Enumerator field checklist

High
Functional
Encroached
Silt visible
Maintenance visible
before
during
after
Illustrative — not actual RWB findings

Tank Management Committee (TMC)

Governance FGD + roster review

Moderate
Formed
No
Active
Yes
Women %
55%
50% target line
Illustrative — not actual RWB findings

Panel 4 · Linked evidence

Cross-references

High
  • Linked case study: Early signals from Jharkhand check damopen →
  • Household-survey cluster (n≈120)open →
  • Satellite water-spread thumbnail (Post-monsoon 2024)open →
  • Full evidence trail (methods)open →
Illustrative — not actual RWB findings