Module 04 · Waterbody Structure Profile
Odisha site 8
WB-1007Phase 2 · early learningInsufficient
Panel 1 · Structure & site facts
Site register (illustrative)
High
- Structure
- Other
- Phase
- P2
- Arm
- Intervention
- State
- Odisha
- District
- Odisha District 2
- Agro-ecozone
- Coastal
- Works period
- FY 2021–22
- NGO partner
- WOTR
- Per-waterbody cost
- ₹ 25 lakh
- Storage created (approx.)
- 22,500 m³
- Coordinates
- 24.335, 74.209
- Matched comparison
- WB-1008
Structure type populates from the final waterbody database (pending) — filled here from placeholder classifications.
Panel 2 · Geohydrological classification
Litho-hydrological review + PRA
Moderate
Zone
Recharge
Permeability
Medium
Landform
Alluvial plain
A waterbody in a discharge zone on impermeable strata cannot support a groundwater-recharge claim regardless of surface observations. This classification gates Panel 3 and the SROI recharge stream.
Panel 3 · Current status & early signal
PRA + site observation
Indicative
Early learning — not a long-term outcome claim
At the time of assessment, Odisha site 8 is functionally operational with visible water retention through the post-monsoon window. Community reports a modest uplift in cattle-water access; TMC is formed and active. A DiD-style outcome readout is not rendered for Phase 2 sites because no comparable baseline exists.
Site observation status
Enumerator field checklist
High
Functional
Encroached
Silt visible
Maintenance visible
before
during
after
Tank Management Committee (TMC)
Governance FGD + roster review
Moderate
Formed
Yes
Active
Yes
Women %
65%
50% target line
Panel 4 · Linked evidence
Cross-references
High